ARGO AWP
● AI INTEGRATED PROJECT DELIVERY
Argo AWP connects engineering, workface planning, 3D model, and commissioning on a single data backbone — deployed in 12 weeks, built on CII best practices.
12 wks
Fully operational deployment — no custom builds
9 pts
More productive field time on AWP-deployed projects
$31B
Annual U.S. rework cost from poor data quality
4
Specialist partners. One unified delivery framework
The challenge
Fragmented systems don’t just slow teams down — they compound into rework, budget overruns, and safety exposure. Engineering in one tool. Planning in another. Progress tracked in spreadsheets. Commissioning isolated at the end. The industry has accepted this as normal. It doesn’t have to be.
Nearly two full days each week lost to searching for information, resolving conflicts, and reworking what bad data caused teams to build wrong.
Workface planning loses fidelity at every handoff. Field crews execute on assumptions instead of validated data — driving rework and preventable delays.
499,000 net new construction workers needed in 2026 to meet demand. Capital teams must deliver more with fewer people — and legacy toolstacks cannot get them there.
See it in action
Watch our team walk through how Argo connects every phase of project delivery — from engineering work packages through commissioning handover — and what the first 12 weeks of deployment looks like in practice.
What changes
Argo doesn’t bolt onto your existing stack — it replaces the integration tax entirely. Here’s what project teams gain from day one.
01 — PLANNING
Engineering work packages flow directly into workface planning with no manual translation. Your planners work from validated data, not assumptions passed through email chains.
02 — PROGRESS
Field reporting, 3D model, and schedule converge in one real-time view. Decisions happen on facts. Rework driven by stale data is eliminated at the source.
03 — WORKFORCE
AWP-deployed projects gain 9 percentage points of productive field time per shift. Fewer people deliver more — predictably, safely, and without heroics.
04 — COMMISSIONING
Commissioning sequencing ties directly to the AWP data backbone — not bolted on at the end. No late-stage firefighting. No handover chaos. Clean startup on schedule.
The platform
Argo isn’t a software evaluation — it’s an operational deployment. The framework arrives pre-configured to CII data definitions on Oracle’s enterprise infrastructure, with integrations to P6, Aconex, ERP, and document control included from day one.
AWP Delivery
AWP governance layer and integration hub. Near real-time stakeholder data access configured to CII data definitions from the start.
Delivery Partner & AI
Configurations deployed as-is to CII standards. Gaea custodies the Unifier environment. Bolo AI enables intelligent data interrogation across the project backbone.
Visual Planning & Progress
Transforms the 3D engineering model from a design artifact into a live construction execution tool. Progress visible at the component level.
Commissioning & Startup
Closes the construction-to-operations handover loop. Commissioning sequencing directly connected to the AWP data backbone via TrackerCheck.
Built on Oracle Primavera. Aligned to CII AWP standards. Deployed across engineering, planning, 3D model, and commissioning in 12 weeks.
Book a consultation
Book a 30-minute consultation with the Argo team. We’ll walk through your project profile, assess fit, and walk you through a deployment timeline — no obligation.
ARGO AWP
Oracle Primavera
Gaea
IMS
Tracker Technologies
© 2026 Argo AWP and its affiliates & partners. · argo-awp.com